The Vision: Construct a dormer which consists of three bedrooms, two bathrooms, new mechanical, plumbing and electrical.

 

Summary: The residential home was occupied throughout the entire construction of the new dormer. This project required major demolition such as roof demo and cutting the basement slab in order to pour reinforced pads for load bearing columns. Major HVAC + Plumbing Upgrades

Previous
Previous

Powder Room Upgrades

Next
Next

Second Floor Loft