The Vision: convert the bathroom tub to a tiled stand up shower.

 

SUMMARY: This project included major demolition of the the cast iron bathroom tub, the shower walls and all piping was removed. A new two inch drain line was installed per the Mass Plumbing Code. A new stand up shower was built and tiled. We removed the existing floor and installed a ceramic tile floor. Light wall demo was needed to remove water damage, the recessed medicine cabinet and to connect the new sink’s hot + cold water lines. After new paint was applied all new bathroom accessories were mounted to the wall.

bEFORE + AFTER

Next
Next

Powder Room Upgrades